Zero Emission Train from the Port of Los Angeles to Barstow (2024)

CARB staff analyzed available zero emission locomotive technologies and determined the minimum number of locomotives required to pull 130 double stacked rail cars from the Port of Los Angeles to Barstow.

Staff analyzed the feasibility of using current battery electric and hydrogen fuel cell zero emission (ZE) locomotive technologies from the Port of Los Angeles (POLA) to Barstow, a high-traffic freight route in California. For a train to complete a trip from POLA to Barstow, there must be sufficient power and energy supplied from the locomotives throughout the trip. To determine the number of current ZE locomotives required to pull 130 double stacked railcars from POLA to Barstow, power and energy required to complete the trip needed to be calculated while taking into account length of trip, track grade, rolling resistance, and drag. Once the power and energy required to complete the trip were calculated, staff were able to determine the minimum number of ZE locomotives required to supply the power and energy needed. The ZE locomotive models being evaluated in this analysis are Wabtec’s FLXdrive Heavy-Haul battery electric locomotive, Progress Rail’s SD70J-BB battery electric locomotive, and CPKC’s hydrogen fuel cell locomotive with a tender car to carry hydrogen fuel. These models were chosen as they are rated for line haul operation and could be used by Class I railroads.

Analysis Assumptions

Route from Port of LA to Barstow

Zero Emission Train from the Port of Los Angeles to Barstow (1)

The route from POLA to Barstow is approximately 174 miles with elevation as low as 17 feet and as high as 3,800 feet above sea level. The analysis splits the route into five segments as shown in Figure 1. The five segments were defined based on significant differences in elevation change. For example, Segment 1 has no elevation change, while Segments 2 and 3 have elevation changes with hill grades of 0.6% and 2.2%, respectively. Segments 4 and 5 are downhill portions of the route.

Power and Energy Requirements

The power and energy required to travel along each segment of the route from POLA to Barstow were calculated. Powerwas calculated by finding the net forcerequired for the locomotives to pull the train multiplied by the train’s velocity.The net forces calculated along each segment considers the force to overcome a hill against gravity, drag force, and rolling resistance (frictional forces). Energy requirement was calculated by multiplying power by the timeit takes to travel along that segment based on the train’s velocity.

The mass of the 130 double stacked railcars, with each container weighing 19 tons, used in the analysis was calculated using the methodology found in CARB’s Truck vs. Train Emissions Analysis. The total mass of the train is equal to the sum of the railcar mass with cargo and locomotive mass.To determine the number of ZE locomotives required to complete a trip from POLA to Barstow, a minimum energy and power requirement was determined. Staff found that Segments 1-3 require the use of energy from the locomotive, while Segments 4-5 do not. Therefore, the minimum energy required to complete the trip is the sum of the energy needed in Segments 1‑3. A minimum power requirement was determined by determining the most power required by a segment. Segment 3 has the largest power requirement due to its steep grade, so the Segment 3 power requirement was set as the minimum power requirement for the train to complete the trip from POLA to Barstow.

Analysis Results

The table below shows the minimum number of ZE locomotives required to complete the trip from POLA to Barstow for different locomotive types and models.The analysis also compares the number of locomotives required for different factor of safety (FOS) values to account for errors (up to 20%) in power and energy calculations.

Locomotive Model

Type

Weight per locomotive (MT)

Traction Power per locomotive (MW)

Usable Energy Capacity per locomotive (MWh)

Minimum Number of Locomotives Required

FOS: 1

FOS: 1.2

Typical Diesel Locomotive

Diesel

218

3.2

65.2

7

8

SD70J-BB

Battery Electric

245

5.7

13.05

4

5

FLXdrive Heavy-Haul

Battery Electric

189

3.2

7.65

6

8

CPKC Line-Haul (with tender car)

Hydrogen Fuel Cell

167

3.3

55.8 (per hydrogen tender car)

6

8

Key Takeaways

The major limiting factor that impacts the number of locomotives required to travel from POLA to Barstow is traction power. Due to the steep inclines along the Cajon Pass, a locomotive with higher traction power is favorable. The analysis concludes that for a train consisting of 130 double stacked railcars, an equal amount or fewer ZE locomotives are required complete the trip compared to diesel locomotives, which further demonstrates the capability of ZE locomotives along routes like POLA to Barstow.

Progress Rail’s SD70J-BB battery electric locomotive will require the least number of locomotives (4 locomotives with factor of safety of 1) to travel from POLA to Barstow as it offers the highest traction power compared to the other locomotive models. When using typical BNSF diesel locomotives, 7-8 locomotives are required to complete the trip. CPKC’s hydrogen fuel cell locomotive and Wabtec’s FLXdrive Heavy-Haul have a similar power output, and thus the number of locomotives required are similar between the two models.

Staff also estimate that the analysis result is scalable to heavier or lighter trains. That is, a 50% increase in the number of double stacked railcars will result in approximately 50% more locomotives required for all three zero-emission models (when factor of safety is 1 and not including combinations of different types of locomotives within a train). While the relationship between train mass and number of locomotives needed is not exactly linear, the trend generally holds. The weight of railcars and containers contribute most to the power required to complete the trip, thus affecting the number of locomotives needed.

Please see the ZE Locomotive Feasibility Analysis: Zero Emission Train from the Port of Los Angeles to Barstow document below for more details about the methodology and results.

Supporting Media

Feasibility Analysis: Zero Emission Train from the Port of Los Angeles to Barstow

FEASIBILITY ANALYSIS ZERO EMISSION TRAIN FROM THE PORT OF LOS ANGELES TO BARSTOW_0.PDF · 525 KB

Zero Emission Train from the Port of Los Angeles to Barstow (2024)
Top Articles
Latest Posts
Article information

Author: Gregorio Kreiger

Last Updated:

Views: 6143

Rating: 4.7 / 5 (57 voted)

Reviews: 88% of readers found this page helpful

Author information

Name: Gregorio Kreiger

Birthday: 1994-12-18

Address: 89212 Tracey Ramp, Sunside, MT 08453-0951

Phone: +9014805370218

Job: Customer Designer

Hobby: Mountain biking, Orienteering, Hiking, Sewing, Backpacking, Mushroom hunting, Backpacking

Introduction: My name is Gregorio Kreiger, I am a tender, brainy, enthusiastic, combative, agreeable, gentle, gentle person who loves writing and wants to share my knowledge and understanding with you.